Quote Originally Posted by Steve Lonie View Post
That's solid looking. It looks like the track is the standard 3/8" deep. Is the base two pieces of three-quarters? I'm thinking a single piece of three-quarters would suffice.
The track is Rockler T track. The base is two pieces of 3/4 plywood glued together that I had leftover from another project. I used a flat 2X12 cut square for the base for my vice. the 2x12 works just as good as the plywood and was easier since I didn't have to glue two pieces of plywood together. You can see the base for the vice on the shelf below the table behind the plastic containers on the right.