Quote Originally Posted by EUDE75 View Post
That's good. That'll help alot.

Sent from my SM-P905V using Tapatalk
I've got the single stage deal down to a science.
If I start with primed brass, weight and measure randomly as I go, I can crank out 100 every 45 minutes. I usually set aside 6 hours or so for bulk loading.

Sent from my SM-J727V using Tapatalk